3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Modify plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.
Additions / Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy. Work to include new air outlets, re-balancing, and new transfer duct…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of water-filled yodock plastic barriers and chainlink fence on top as per plans in compliance with nycbc. no change in use, egress or occupancy under this application
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Herewith Filing Modifications to existing Sprinkler System in connection with ALT-CO to build out and establish a Cafeteria accessory to existing office at the 12th Floor.
Removal and Installation of non load bearing partitions as per plans filed herewith. No change in use egress or occupancy. 14th floor construction /15th floor marketing
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 17-20th Floors as per plans (Salesforce Restrooms Refresh.) N…
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
The mechanical scope of work submitted under this application entails demolition of existing mep services. the systems include ductwork and distribution.
Architectural modifications in support of upgrades to the building facade and interior finish. No change in use, egress or occupancy.
Installation of new steel beams for atm machine support as shown on drawiings. no change to use, egress or occupancy.
Herewith filing to install new AC and vent systems and new kitchen exhaust system as per the drawings.
Interior pocket renovations of existing office building. scope of work shall include new interior partitions, suspended ceilings, millwork, and finishes. existing core / shell mep…
Stair opening infill on the 28th floor as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings, finishes and stair on the 27th floor as per plans. No change to use, egress or occupancy.
Facade restoration as per plans filed herewith. No change to use, egress or occupancy
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Herewith filing modification to existing mechanical ductwork/piping in conjunction with Alt-Co to establish new place of assembly. Refer to Associated Application M01337402-S2 For…