2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Minor demolition with installation of new partitions on the 28th floor as per plans. No change to Use, Egress or Occupancy.
Plumbing work at cellar and 1st floor beauty salon of an existing 14-story building. related general construction work has been filed initially. no change in use, egress or certifi…
Sidewalk shed installation as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Sprinkler modifications on floors SC1, Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Alteration type 3 - construction equipment - sidewalk- shed proposed installation of heavy duty sidewalk shed. no change in use occupancy or egress under this application. live loa…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 27 through 29. Construction costs and filing fees included in full-floor Mechanical job # M01293931-S1.…
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Limited Exterior Facade Repairs including stone replacement, stone repairs, brickwork replacement, mortar joint repointing. No change to use, egress, or occupancy.
Herewith file to convert from existing deli store to bagel store. work scope to include installation and rearragement of equipement as well as refinishing of floor and wall tiles.…
Structural modifications on MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Install of temp Platform, Sculpture, no alt to exist structures for Vertical Highways. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All prod…
Structural changes as indicated on plans; including framing for new partition wall door.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 22nd floor as per plans filed herewith. no change in use, egress, or occupan…