2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Installation of temporary construction fence and sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy…
Minor demolition with installation of new partitions on the 28th floor as per plans. No change to Use, Egress or Occupancy.
Installation of single cage 7000# capacity personnel/material hoist hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev…
Temporary hoist run-back structure during bldg alt, filed separately. hoist run-back structure shall comply with chapter #33 of the nyc building code. no change in use, occupancy o…
Herewith file to convert from existing deli store to bagel store. work scope to include installation and rearragement of equipement as well as refinishing of floor and wall tiles.…
Structural modifications taking place on the 16th fl Construction/ 17th fl Marketing floor as per plans filed herewith. No change in use, egress or occupancy
Install of temp Platform, Sculpture, no alt to exist structures for Vertical Highways. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All prod…
Demolition and general construction work on 27th floor as per plans. No change to use, egress or occupancy.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 27 through 29. Construction costs and filing fees included in full-floor Mechanical job # M01293931-S1.…
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 22nd floor as per plans filed herewith. no change in use, egress, or occupan…
Sprinkler/Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
Filing to remove and install new plumbing fixtures as per plans filed. no change to use, egress or occupancy.
Alteration type 3 - construction equipment - sidewalk- shed proposed installation of heavy duty sidewalk shed. no change in use occupancy or egress under this application. live loa…
Interior renovation of the duplex apartment associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
Mechanical modifications on floors Cel, 01, MZ1, 02 as per plans filed herewith, including commercial kitchen rangehood ventilation system for Jack D's Steakhouse.
Plumbing modifications on floors Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Limited Exterior Facade Repairs including stone replacement, stone repairs, brickwork replacement, mortar joint repointing. No change to use, egress, or occupancy.
Interior renovation to apartment 4h including existing kitchen, bathroom & powder room. no change in use, occupancy or egress.