New stair opening in 10th Floor slab as shown on drawings. No change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 3rd floor (2c/3m) as per plans filed herewith. no change in use, egress, or…
Mechanical work as per plans filed. application filed in conjunction with new building 121208095.
Filing for plumbing and sprinkler work associated with interior renovation of 17th & 18th floors thomson reuters office as per plans
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & Ground Floors as per plans (CBRE Retail Space.)…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1.…
Temporary Enclosure System for Louver Work
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes and Renovation of Existing Pantry on Part of the 17th Floor. No Change to Occup…
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under th…
Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the Cellar & 1st Floor as per plans (Retail Space - Renovations.) No change to use,…
Alteration for interior work to non-bearing partitions at first floor. no change of bulk, use, occupancy, or egress.
Modification of Cellar, 1st, Mezzanine, 3rd, 4th, 7th, 8th, 11th, 12th, 13th Mezzanine, 14th, 15th, roof per plans filed
Structural modifications taking place on 17th and 18thfloors as per plans filed herewith. No change in egress, use, or occupancy
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1.…
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
AT&T - Installation of gas line from basement to roof routed along rear of building in existing conduit (10097550) as per plans. Installation of gas meter in the basement. No chang…
Modifications to existing HVAC as per plans filed herewith. No change in use, egress or occupancy under this application
Herewith filing to update C of O description of use for existing 5 story commercial building and minor work to entry closet. No change to egress.