3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Preparation Work for Full Demolition - Equipment Use for Interior Demo
Structural work to include installation of access platform at 6th floor mechanical room.
Mechanical modifications taking place on the 17th floor (18th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Install new 2 wc, 2 lavs, 2 hwh non gas, 2 sinks, 1 dishwasher, 1 funnel drain, 1 water piping & 1 sanitary piping.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No chang…
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Modifications to the existing HVAC system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
Structural work filed in conjunction with M01355520-I1 as per drawings filed herewith.
Modifications to the existing HVAC system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th fl (suite 1109 - nosova) as per plans filed herewith. no change in use,…
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
General construction work to include alteration of interior finishes & tenant layout. No change of use, egress or occupancy.
Modifications to the existing sprinkler system on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the cellar floor (Harry Winston - Cellar Fit-out) as per plans. No change to use, egress or occupancy
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to…
General construction work to include installation of access platform at 6th floor mechanical room.
Mechanical changes as indicated on plans.
Filing herewith for the removal of HVAC ductwork as per plans filed herewith. 14th floor construction/15th floor marketing