2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Proposed facade repairs as per plans submitted herewith. there is no change in use, ergree or occupancy.
Sprinkler modifications taking place on 48th floor construction (49th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Infill existing stair opening 150 sf. provide new ada-compliant ramp 300 sf. no change to use, egress or occupancy.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existi…
Installation of new brick wall on partial ground floor facade as per plans filed herewith. no change in use, egress or occupancy.
Filing herewith sprinkler work as per plans.
Plumbing modifications taking place on the 20th floor as indicated on the drawings.
General construction for the interior build-out of the 35th floor, as shown on plans filed herewith. No change in use, egress, or occupancy.
Filing herewith for built up concrete ramps and terrace
Installation of new ductwork and hvac system
Proposed installation ofmini split heat pump system
Modifications to the existing Sprinkler System: Remove (192) existing Sprinkler heads and Install (144) new Sprinkler heads on the 16th Floor as per plans (AHU Replacement.) No cha…
Application filed for sprinkler additions/modifications on the 14th fl as per plans filed herewith. no change in use, egress, or occupancy.
Erect illuminated projecting D/F advertising sign on wall. Structure filed under sepatate application # M01348318. No change of use, egress or occupancy
Alterations to plumbing system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
Installation of 4 new deluge sprinkler heads in cooling tower at bulkhead.
Proposed temporary construction field office per plans filed herewith. no change in use, egress or occupancy.
Terra cotta repair & replacement (with gfrc), stone and brick repairs. miscellaneous facade repairs. no change in use, egress or occupancy.