3,372 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,372 permits
Plumbing work in conjuction with interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
The addition of split ac heat pump systems and energy recovery ventilation to serve the space
Filing pl for the demolition, removal, and reinstallation of existing risers and pl fixtures for bathrooms
Filing sp for relocation and reinstallation of branch piping and sprinkler heads
General construction work related to the demolition of existing interior partitions. Installation of new furred out layer of gyp. bd. on existing partitions. Repair of existing par…
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law fo…
Modifications to Existing Sprinkler System on Part of 16th Floor
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
Demolition and installation of core restrooms fixtures, installation of new plumbing fixtures in 19th floor interior fit out. Installation of new sprinkler heads and related piping…
Mh work filed in conjunction with dob now gc, sp, and pl. no change to use, occupancy or egress.
Installation and use of temporary supported scaffold equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
plumbing fixture replacement, relocation, installation, removal, no change to use, exits or occupancy
Suspended scaffolds for facade restoration as shown on plans
Temporary structures and temporary changes to the Theater for the run of the show CATS at Broadhurst Theater. No change to use, egress, or occupancy.
Structural work on the cellar level as indicated on drawings.
Interior build out of partial floor as shown on drawings. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Minor interior renovation of suite 909. no change to use, occupancy or egress.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Mechanical work for interior office renovations on 17th floors as per plans filed herewith. No change to use, egress, or occupancy.