3,372 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,372 permits
General Construction to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Facade repairs on existing building. no change to use, occupancy or egress.
Propose to perform demo work. No change in use, egress or occupancy.
Heating/cooling and ventilation for the new perimeter area. Outdoor radiant heating for the new terrace area.
Mechanical modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Filing alt-2 for apt 12b,14a/14b,15a,15-i,that encompasses interior removals and renovations of fire damaged building. the work will include repair and replacement of non-load bear…
Structural modifications taking place on the 5th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Modifications to the existing sprinkler system on the 14th and 17th Floors (ICBC), as per plans. No change to use, egress, or occupancy.
Architectural modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans.
Installation of temporary suspended scaffold equipment
General construction restaurant rosa mexicano renovations including replacement of interior finishes & equipment as per plans filed herewith. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Installation of new hvac air-conditioning heat pump split system for ground floor retail teant c
Exterior Facade repairs per plans filed including: Removal & replacement of masonry units & parapet coping. Masonry repointing. Restoration & reinforcement of existing steel spandr…
New interior office renovation includes new perimeter offices, conference rooms, and reception area.
Alterations to mechanical system on 16th floor as per plans. No change to use, egress or occupancy.
Herewith file plans for the replacement of multi V indoor units and installation of new multi V outdoor units in cellar, 1st floor and 2nd floor roof terrace. No change to use, egr…