3,342 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,342 permits
Plumbing modifications taking place on the 7th floor as indicated on the drawings.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.
Minor interior renovation of suite 1100b. no change to use, occupancy or egress.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Installation of industrial rope access for facade inspections.
Propose installation of (1) air-cooled package unit (10th flr) with associated ductwork (7th & 10th floor). No change to use, egress or occupancy.
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Renovations of existing skate hut in basement as per plans. No change to use, egress or occupancy.
Mechanical modifications to the 9th and 10th fl as per plans filed herewith. No change in use, egress, or occupancy.
Interior renovation of apartment 26C, including new minor partitions, finish materials on the floor, wall and ceiling. All as per accompanying plans. No chance in use, egress or oc…
Alterations to mechanical system as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
At 26th floor tenant space, removal of interior partitions and removal/relocation of existing glass doorsas per plans filed herewith. no change to occupancy or means of egress.
Elevator machine room roofing membrane replacement (EMR Roof), as per plans. No change to use, egress, or occupancy.
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL…
Interior demo & Architectural changes as indicated on plans.
Filing herewith sprinkler work as per plans. no change in use, egress, or occupancy.
Structural work in existing skate hut in basement as per plans. No change to use, egress or occupancy.