3,342 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,342 permits
Reinforcement of existing 16th Floor construction for floor finish, new interior partition walls, etc.
Install illuminated led advertising sign (sign c) on wall structure filed under separate application # m01349543. (changeable copy)
Modifications to the existing sprinkler system on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Mechanical modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Removal of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this appli…
Install illuminated led advertising sign (sign a) on wall structure filed under separate application # m01349543. (changeable copy)
General construction modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Structural modification on the 17-18 floor as per plans. No change to use egress or occupancy.
Minor renovation work, enclose elevator lobby and renovate toilets, change in occupancy & use from office space to eating and drinking on the second floor. work in conjunction with…
Mechanical systems work on the 42nd marketing floor(41st construction floor) as per plans filed. no change to use, egress or occupancy.
Illuminated non-advertising accessory wall sign - citibank. no change of use, egress or occupancy.
Sign structure removal lower tower sign. No change of use, egress or occupancy
Interior renovation of the 42nd marketing floor/41st construction floor. removal &installation of walls, doors, floor finishes, and ceilings as per plan. the area of work is 3,500…
Sprinkler work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Modification the existing mechanical system as per plans. No change to use, egress or occupancy
Interior mechanical renovation of existing commercial unit on the 14th Floor as per plans. No change to use, occupancy, or egress.
removal and install new mechanical ductwork and equipment to accommodate tenant renovations on partial 6th floor as per plans filed herewith only.
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Renovate (3) existing bathrooms in apartment #25D. No change in use, egress or occupancy.