2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Replace fixtures as noted in apt 12-B, 14-AB,15-I,15-A
Sprinkler modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed.
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith.
Interior minor removals and renovations for suite 603 as per plans filed herewith. no change to use, egress or occupancy.
sprinkler modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Modification of existing HVAC system on the 32nd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to us…
Modification of existing sprinkler system. no change to use, egress or occupancy.
General construction associated with replacement of existing heating plant. no change in egress or occupancy.
Temporary plywood storefront enclosure
Plumbing work as shown on plans
Sprinkler modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Install 1 wc, 1 lav, 6 sinks, 3 dishwashers, 3 water filters, 4 hwh non gas, 5 floor drains, 1 water piping & 1 sanitary piping.
General construction as shown on plans filed herewith. No change in use, egress, or occupancy.
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Interior renovation of existing 1st floor docotr's office as per final co #101045833f including the removal & installation of non-load bearing partitions, new floor & wall finishes…
Application filed for plumbing additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Propose new ductwork. No change to use, egress or occupancy.
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Mechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.