3,342 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,342 permits
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Filing herewith for extrerior repairs as per drawings. there is no change to use, egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Alterations to sprinkler system on 15th floor as per plans. No change to use. egress or occupancy.
Erect illuminated accessory business double -faced blade wall sign b
Suspended Scaffold for Facade Restoration as Shown on Plans
Installation of suspended scaffold for facade work or inspection.
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing modifications to floors 9 & 10 as per plans filed herewith. No change in use, egress, or occupancy.
Illuminated non-advertising accessory wall sign - citibank. no change of use, egress or occupancy.
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Construction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
Replace plumbing fixtures with new at existing roughing (25 lav, 25 wc), cap & remove (25 tubs), and install new plumbing fixtures at new roughing (25 showers) on the 5th floor.
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
New, multiple dwelling w/ commercial (retail) first floor, building
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
Mechanical work for ING Financial on 10th and 11th floor
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.