3,342 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,342 permits
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Alterations to sprinkler system on 15th floor as per plans. No change to use. egress or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No chan…
Filing herewith for extrerior repairs as per drawings. there is no change to use, egress, or occupancy.
Plumbing modifications to floors 9 & 10 as per plans filed herewith. No change in use, egress, or occupancy.
Install of temp scenic partitions and elements, no alt to exist structures, for Tiffany Exhibit. TPA not required, TUP filed as needed. Producer is responsible to monitor site safe…
Illuminated non-advertising accessory wall sign - citibank. no change of use, egress or occupancy.
Suspended Scaffold for Facade Restoration as Shown on Plans
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of system scaffold, and work platform as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this appl…
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Construction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
Erect illuminated accessory business double -faced blade wall sign b
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Installation of temporary sidewalk shed as per plans. overhead protection shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this appl…
Installation and removal of Sprinkler fixtures along with related piping.
Mechanical work for ING Financial on 10th and 11th floor