3,342 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,342 permits
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Filing herewith Mechanical work on the 13th FL. as per plans filed herewith. No change to use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Suspended Scaffold for Facade Restoration as Shown on Plans
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
Illuminated non-advertising accessory wall sign - citibank. no change of use, egress or occupancy.
New stair opening at 17th Floor and new convenience stair between 16th & 17th Floors as shown on drawings. No change in use, egress or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Installation and removal of Sprinkler fixtures along with related piping.
Installation of system scaffold, and work platform as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this appl…
Erect illuminated accessory business double -faced blade wall sign b
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Construction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.