2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No ch…
Installation of temporary suspended scaffolds and material hoist on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and…
Modification the existing sprinkler system on the 17 floor as per plans. No change to use, egress or occupancy
Installation of temporary suspended scaffolds, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applica…
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of sprinkler heads as per plans filed. no change to use egress or occupancy.
Installation of hvac and ventilation equipment as per the plans. no change to zoning, use, egress, or occupancy under this application.
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Filing herewith drawings indicating the replacement of a Sprinkler Fire Department Siamese connection. No change in use, egress, or occupancy under this application.
Interior Demolition interior partitions, doors, ceilings and flooring.
Herewith filing for installing a Temporary sprinkler loop as per the plans. No change in use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Erect exterior wall structure for signs as per plan. signs filed under separate application numbers. no change in use, egress or occupancy.
Mechanical filing for ductwork & FPBs on the 11 floor tenant space.
Modifications to plumbing systems as per plans filed herewith filed in conjunction with NB #M00505081. No change of use, occupancy or egress.
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
Interior renovation of the existing 6th floor as per submitted plans.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…