3,389 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,389 permits
Sprinkler work taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Omega - Storefront and minor interior work on the 1st floor as indicated on drawings.
Plumbing modifications taking place on floor 001 as per plans filed herewith. No change in Use, Egress or Occupancy.
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
Interior removals work at 8m/8c floor including partition, ceiling and door removals as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Sprinkler modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Structural modifications taking place on the 13th (12a marketing) and 14th floors as per drawings filed herewith. no change in use, egress or occupancy.
Preparation Work for Full Building Demolition - Interior Demolition
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Erect sign tag as non-illuminated plate letter (sign 4) @ east 50th street elevation santader with logo
IRA Rope Access Facade Inspection
Facade repairs. scaffold inspections, 3 men letter
Minor Interior Demolition on Cellar,1-5 floors as per plans. No change to use, egress or occupancy.
Interior renovation and installation of commercial exhaust system for take out pizzeria, no change in use occupancy or egress
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Installation of 300 psf sidewalk shed, construction fence, roof of protection and ohp via needle beam as per plans. all equipment shall comply with chapter #33 of the 2022 code. no…
Suspended Scaffold for Facade Restoration as Shown on Plans