3,389 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,389 permits
Sprinkler Head and Temp Loop changes as indicated on plans.
Mechanical work on the 10th floor (Dublin & Co.) as indicated on drawings
Structural modifications associated with lobby renovation and reframing of 2nd floor mezzanine extents as per plans filed herewith. No change to use, egress, or occupancy.
Sprinkler modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Application filed for sprinkler additions/modifications on the 15th floor (techno) as per plans filed herewith. no change in use, egress, or occupancy.
Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy
Alterations to existing mechancial systems as per plans filed herewith
removal of pre-action sprinkler and associated panel.
Plumbing modifications taking place on floor 001 as per plans filed herewith. No change in Use, Egress or Occupancy.
Interior renovation and installation of commercial exhaust system for take out pizzeria, no change in use occupancy or egress
Filing herewith sprinkler work in conjunction with renovation of existing office as per plans. no change in use, egress or occupancy.
Preparation Work for Full Building Demolition - Interior Demolition
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Installation of 300 psf sidewalk shed, construction fence, roof of protection and ohp via needle beam as per plans. all equipment shall comply with chapter #33 of the 2022 code. no…
Facade repairs. scaffold inspections, 3 men letter
Interior removals work at 8m/8c floor including partition, ceiling and door removals as per plans. no change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.