Facade repairs. scaffold inspections, 3 men letter
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Alterations to existing mechancial systems as per plans filed herewith
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Suspended Scaffold for Facade Restoration as Shown on Plans
Plumbing modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy.
Application filed for structural modifications on the 15th floor & partial 16th floor (techno). work includes removal of convenience stair and infill of concrete slab. no change in…
Application filed for sprinkler additions/modifications on the 15th floor (techno) as per plans filed herewith. no change in use, egress, or occupancy.
Minor Interior Demolition on Cellar,1-5 floors as per plans. No change to use, egress or occupancy.
Structural modifications associated with lobby renovation and reframing of 2nd floor mezzanine extents as per plans filed herewith. No change to use, egress, or occupancy.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Structural modifications taking place on the 13th (12a marketing) and 14th floors as per drawings filed herewith. no change in use, egress or occupancy.
Interior renovation and installation of commercial exhaust system for take out pizzeria, no change in use occupancy or egress
Mechanical work on the 10th floor (Dublin & Co.) as indicated on drawings
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
removal of pre-action sprinkler and associated panel.
Sprinkler modifications taking place on the 7th floor as indicated on the drawings.
Sprinkler work taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler Head and Temp Loop changes as indicated on plans.