Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HW…
Removal of existing finishes and partitions, and installation of new partitions, finishes and fixtures. no change in use or occupancy. no change in storefront or exterior wall. no…
Herewith filing for the installation of a new demising wall as reflected in plans submitted. No change in use, egress or occupancy is proposed under this application.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Filing pl/sp for 8th floor interior renovation, new offices, pantry, conference room, & bathrooms as per plan. sprinkler heads as per plan.
Filing herewith to add hold opens connected to the fire alarm at two existing doors on the 5th and 6th floors.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
FILING GC FOR 8TH FLOOR INTERIOR RENOVATION, Construct New Offices, Pantry as per Plan. NO Change in use, Egress, or Occupancy
Installation of shoring for truck corridor
Plumbing work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19)
General Construction to take place on the 25th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Mechanical modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Facade repairs include, but not limited to brick repair, repointing, lintel repair & waterproofing, stone repair, terra cotta repointing, sill replacement as per plans filed. No ch…
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Replacement of 3 ton split ac system serving front east office and 2nd fl
Construction modifications taking place on the 7th floor as indicated on the drawings.
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occ…