3,389 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,389 permits
Filing herewith to add hold opens connected to the fire alarm at two existing doors on the 5th and 6th floors.
Plumbing work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19)
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
General construction modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Application filed for mechanical modifications/additions on the 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing for the installation of a new mechanical unit and associated ductwork in conjunction with the interior renovation of an existing commercial space. There is no change…
Installation of temporary const. plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use…
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
Filing pl/sp for 8th floor interior renovation, new offices, pantry, conference room, & bathrooms as per plan. sprinkler heads as per plan.
Replacement of 3 ton split ac system serving front east office and 2nd fl
Sprinkler modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Structural in conjuction with new building job number # m01042409-i1
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occ…
Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HW…
FILING GC FOR 8TH FLOOR INTERIOR RENOVATION, Construct New Offices, Pantry as per Plan. NO Change in use, Egress, or Occupancy
Installation of a temporarily supported scaffold and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occu…