3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Structural modification as per plans. No change to the use, egress or occupancy.
Suspended scaffolding for facade restoration as shown on plans
Plumbing and sprinkler work related to the interior renovation of existing commercial space on the second floor. no change in use, egress, or occupancy.
Replace existing non-illuminated sign (neuberger)
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Mechanical modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy .
Replace plumbing fixtures with new at existing roughing (1 wc, 1 lav) at apt 37b on the 36th floor.
Filing herewith standpipe work at existing 7th floor space. No change in use, egress or occupancy.
minor demo of mechanical systems (20th floor) and installation of new ductwork on the 21st floor (Highlife) as per plans filed herewith. No change to egress use or occupancy.
Filing herewith plumbing work in conjunction with renovation of existing office. no change in use, egress or occupancy.
Filed pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conversion including partial demolition and perm…
Modifications to the existing sprinkler system with installation of a temporary loop on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Selective removals of non-load bearing partitions, flooring, wall bases, millwork cabinetry/shelving, doors and finishes as per details on plans.
Filing for structural and general construction repairs to this existing parking garage. No change to use, occupancy or egress.
Mechanical work on the cellar, 1st thru 19th floors and roof as indicated on drawings.
Mechanical modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary…
Fit-out of a 6,000 sf (approximate) office space including but not limited to the construction and installation of interior partitions wall for office space and finishes in 15th fl…
Filing herewith mechanical work in conjunction with renovation of exisitng office as per plans. no change in use, egress or occupancy.