2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Sprinkler work for Akin Gump space on floors 41-45.
Sprinkler work on the 10th floor (Dubin & Co.) as indicated on drawings.
General construction work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Demolition and installation of core restrooms fixtures, installation of new plumbing fixtures in 19th floor interior fit out. Installation of new sprinkler heads and related piping…
Plumbing work as shown on plans
Interior fit-out of the entire 5th floor including non-loadbearing partitions. The project includes offices, meeting rooms and support spaces. No change to use, egress or occupancy
Modification/addition to sprinkler system and related piping and installation of Temporary Core Sprinkler protection as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing sprinkler system on the 20,21,22,24 Floors- (Orrick Buildout) as per plans. No change to use, egress or occupancy.
General construction modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy
Interior renovations/alterations inclusive of removal and new installation of interior non-bearing partitions and ceiling finishes.
This project involves the combination of apartments. work shall comply with technical policy & procedure notice (tppn) #3/97 combining apartments to create larger residential units…
Modification to plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Interior renovation of apt. 55a with minor demolition. remove & relocate non load bearing partitions & ceilings per plans. no change in egress, occupancy or use is involved under t…
Filing herewith for Temporary Standpipe as per plans (Provided one Temporary Standpipe with compressor and one fire department Siamese connection.
Interior minor alterations inclusive of structural framing, beams, posts and rail support @ new lift location between level 1 & mezzanine.
mechanical modifications on 18th Floor as per plans filed herewith. no changes in use, egress or occupancy.
Installation of temporary construction fence, supported scaffold, and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change…
Installation of temporary p/m shaft hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist to comply with chapter 33 of nyc bu…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
5th floor demo-- pre-tenant interior non-structural demolition inclusive of partitions removals as per plans filed. no change to use, egress, or occupancy.