2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Mechanical work in conjunction with minor partition work in Suite 301. No change to use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Mechanical modifications as per plans filled herewith. No change in use, egress or occupancy.
renovate apartment 8G, partition, plumbing, electrical work, partial window replacement, no change to use, exits or occupancy
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 12th floor as per plans. No change to use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler work for ING Financial on 10th and 11th floor
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
Mechanical work on the 15th floor. no change to use, egress or occupancy.
Renovation of existing commercial space on partial first floor with plumbing work: new hand sink, 3-comp. sink and ice maker in 1st floor as per plan; no change in use, egress or o…
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Replace some existing plumbing fixtures with new, and install some new. All as per accompanying plans. No chance in use or occupancy.
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy.
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
9th Cycle FISP repairs. No change to use, occupancy or egress.
Plumbing work in conjuction with interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Plumbing work being filed in conjunction with Alteration 2 application number 123771276 to renovate units on the 24th through 27th floors and public halls. No change to use, egress…
Partial demolition means & methods for portions of 2nd floor, mezzanine, 1st floor, escalator removal as per plans. this application is filed in conjunction with m01277980-s5.
5th floor- modification to existing sprinkler system, demolition of branch pipiing and sprinkler heads. installation of tcsp as per plans filed.