3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
New convenient stair between 9th & 10th Floors as shown on drawings. No change in use, egress or occupancy.
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
Suspended scaffold installation for facade repairs and inspections
Installation of new plumbing fixtures and associated piping on the Cellar Floor (Buildout Phase) as per plans. No change to use, egress or occupancy.
Hereby filing for modification of existing sprinkler system, new sprinkler riser throughout. all tenant buildout work to bve filed under a seperate application. this application is…
Modifications to the existing sprinkler system on the (41st floor-Tiger) as per plans. No change to use, egress or occupancy.
Structural work in Penthouse as per plans filed. No change in use, occupancy or egress.
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Rest…
Hereby filing for related mechanical work for proposed alteration.
Omega - Storefront and minor interior work on the 1st floor as indicated on drawings.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy.
Use of Building Maintenance Unit (BMU) #3, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Temporary monorail system as per drawings. monorail system shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application.
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.)…
General construction modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Filing to remove and install new mechanical systems as per plans filed. no change to use, egress or occupancy.
Erect a non-illuminated, accessory business awning for five guys @7th avenue elevation as per drawings file herewith.
Work to commercial space at the 1st floor of a 23 story, commercial building. alterations to include interior commercial fit-out work. no change to zoning, use, egress, or occupanc…
Interior renovation of unit 33A including minor reconfiguration of fixtures and interior non load-bearing walls. New fixtures and finishes throughout.