3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
Interior renovation of unit 33A including minor reconfiguration of fixtures and interior non load-bearing walls. New fixtures and finishes throughout.
Modifications to the existing sprinkler system on the (41st floor-Tiger) as per plans. No change to use, egress or occupancy.
General construction modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Filing to remove and install new mechanical systems as per plans filed. no change to use, egress or occupancy.
Erect a non-illuminated, accessory business awning for five guys @7th avenue elevation as per drawings file herewith.
Plumbing work in conjunction with interior renovation
Use of Building Maintenance Unit (BMU) #2, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Installation of sprinkler/ standpipe system as per plans filled herewith.
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pa…
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egre…
Use of Building Maintenance Unit (BMU) #4, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Filing herewith Structural work as per plans filed herewith. No change to use, egress or occupancy.
Use of Building Maintenance Unit (BMU) #1, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th Floors as per plans (Lowenstein Sandler…
Remove 51 sprinkler heads and piping & install 48 new sprinkler heads and piping.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Rest…
Hereby filing for modification of existing sprinkler system, new sprinkler riser throughout. all tenant buildout work to bve filed under a seperate application. this application is…