2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Architectural modifications to suites 730 and 2410 as per plans. No change to use, egress or occupancy.
Installation of temporary pipe scaffold as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans.
plumbing fixture replacement, relocation, installation, removal, no change to use, exits or occupancy
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Temporary structures and temporary changes to the Theater for the run of the show CATS at Broadhurst Theater. No change to use, egress, or occupancy.
General construction restaurant rosa mexicano renovations including replacement of interior finishes & equipment as per plans filed herewith. no change in use, egress or occupancy.
Mechanical work for interior office renovations on 17th floors as per plans filed herewith. No change to use, egress, or occupancy.
General Construction to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law fo…
The addition of split ac heat pump systems and energy recovery ventilation to serve the space
Alterations to mechanical system on 16th floor as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Suspended scaffolds for facade restoration as shown on plans
Filing pl for the demolition, removal, and reinstallation of existing risers and pl fixtures for bathrooms
Interior build out of partial floor as shown on drawings. No change in use, egress or occupancy.