3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
Filing for General Construction as per plans submitted. No change in egress, use, or occupancy.
Use of Building Maintenance Unit (BMU) #1, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Temporary monorail system as per drawings. monorail system shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application.
Use of Building Maintenance Unit (BMU) #2, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Installation of temporary contractor shed as per plans.
Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy.
Use of Building Maintenance Unit (BMU) #4, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
General construction modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Interior demolition and construction of non-load bearing partitions, finishes, fixtures as per plans. No change to use, egress or occupancy.
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.)…
Installation of sprinkler/ standpipe system as per plans filled herewith.
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egre…
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Rest…
Plumbing work in conjunction with interior renovation
Filing to remove and install new mechanical systems as per plans filed. no change to use, egress or occupancy.
Remove 51 sprinkler heads and piping & install 48 new sprinkler heads and piping.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Construction of interior partitions, doors and ceiling for new office conference room. New convenience stair as shown on drawings. No change in use, egress or occupancy,
Interior renovation of unit 33A including minor reconfiguration of fixtures and interior non load-bearing walls. New fixtures and finishes throughout.
Work to commercial space at the 1st floor of a 23 story, commercial building. alterations to include interior commercial fit-out work. no change to zoning, use, egress, or occupanc…