3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th Floors as per plans (Lowenstein Sandler…
Plumbing work in conjunction with interior renovation
Structural work in Penthouse as per plans filed. No change in use, occupancy or egress.
Filing herewith for the modifications and installations to 4th floor sprinklers. There is no change to use, egress, or occupancy
Use of Building Maintenance Unit (BMU) #3, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Modify existing curtain wall and rear exterior wall of the hotel building for new HVAC unit installation in guestrooms from 2nd to 17th floor. No change to use, occupancy, egress.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of an illuminated accessory business wall sign. reading: pub connolly's. the project falls within times square subdistrict core.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
General construction for ING Financial on 10th and 11th floor
This signage application is filed for the construction of exterior signage only. The project falls within the Times Square subdistrict core.
Install new plumbing fixtures: (2) WCs, (2) Lavatories, (2) HWHs, (2) sinks, (3) Funnel drains, (1) drinking fountain, (1) ejector pump and associated CW/sanitary piping on the Cel…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Erect a non-illuminated, accessory business awning for five guys @48th street elevation as per drawings file herewith.
Remove plumbing and sprinkler fixtures.
Install new ductwork and diffusers per new layout. install new vav box and control. connect new ductwork to existing building hvac system. install new exhaust fan and ductwork at e…
Modifications to the existing Sprinkler System: Installation of (10) new sprinkler heads on the Cellar and (22) heads on the 1st Floor and associated piping as per plans (Retail Sp…
Replacement of existing sprinkler service fire pump in kind capacity.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.