2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL…
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Interior demo & Architectural changes as indicated on plans.
Elevator machine room roofing membrane replacement (EMR Roof), as per plans. No change to use, egress, or occupancy.
Facade repairs include, but not limited to brick repair, repointing, lintel repair & waterproofing, stone repair, terra cotta repointing, sill replacement as per plans filed. No ch…
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
Modification to existing plumbing fixture and sprinkler systems as per plans,
Mechanical modifications to the 9th and 10th fl as per plans filed herewith. No change in use, egress, or occupancy.
Propose installation of (1) air-cooled package unit (10th flr) with associated ductwork (7th & 10th floor). No change to use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Plumbing modifications taking place on the 7th floor as indicated on the drawings.
Structural work in existing skate hut in basement as per plans. No change to use, egress or occupancy.
Alterations to mechanical system as per plans. No change to use, egress or occupancy.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Renovations of existing skate hut in basement as per plans. No change to use, egress or occupancy.