2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL…
Filing herewith sprinkler work as per plans. no change in use, egress, or occupancy.
Renovations of existing skate hut in basement as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Ventilation work, duct distribution as per plans filed herewith. No change to use, egress or occupancy.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
At 26th floor tenant space, removal of interior partitions and removal/relocation of existing glass doorsas per plans filed herewith. no change to occupancy or means of egress.
Mechanical modifications to the 9th and 10th fl as per plans filed herewith. No change in use, egress, or occupancy.
Modification to existing plumbing fixture and sprinkler systems as per plans,
Interior renovation of apartment 26C, including new minor partitions, finish materials on the floor, wall and ceiling. All as per accompanying plans. No chance in use, egress or oc…
Sprinkler modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Install (509) new sprinkler heads and associated sprinkler piping on the 5th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Installation of industrial rope access for facade inspections.
Structural work in existing skate hut in basement as per plans. No change to use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modification the existing mechanical system as per plans. No change to use, egress or occupancy
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
General construction modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Interior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning, use,…
removal and install new mechanical ductwork and equipment to accommodate tenant renovations on partial 6th floor as per plans filed herewith only.