3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floor as per plans (Hines - ADA Restroom.) No change to…
Sprinkler modifications taking place on the 16th & 17th floor as per plans filed herewith. No change in use, egress, or occupancy.
Change of use to establish new Eating and Drinking establishment on 1st Floor as per plans filed herewith.
Installation of temporary fence as per plans. no change in use, egress or occupancy.
Mechanical work associated with associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
Structural work taking place on 1st, 3rd, and 4th floors as per plans filed herewith. no change in use, egress, or occupancy.
General construction taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior demolition in an 8-story building
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change…
This application has been filed for the installation of a Temporary Structure in accordance with BC 3103 for an event scheduled on March 25, 2026.There is no change in use, occupan…
full demolition of 26 story structure using hand held and mechanical means to assist.
Interior office renovation on 4th floor as per plans.
Installation of suspended scaffold for facade work or inspection.
Plumbing modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Job filed to interior renovation on the 18th floor, including polish conc. floor and newnon-bearing partitions, new ceiling painting, new pantry, update bathroom as per plan. no ch…
Mechanical changes as indicated on plans.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of a suspended scaffold for facade inspection only as per plan submitted.