3,403 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,403 permits
Interior demolition in an 8-story building
Mechanical work associated with associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
Partial demolition of floor slab with bracing for convenience stair build-out as per plans filed. no change to use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans,
Filing to remove and install new sprinkler heads & relocate fire-hose & sd connection as per plans filed. no change to use, egress or occupancy.
Dismantle & remove all led screens and associated wall structures related to tltp and netflix. no change in use, egress or occupancy.
Job filed to interior renovation on the 18th floor, including polish conc. floor and newnon-bearing partitions, new ceiling painting, new pantry, update bathroom as per plan. no ch…
Interior office renovation on 4th floor as per plans.
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Installation of temporary fence as per plans. no change in use, egress or occupancy.
General construction taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work taking place in cellar and on floors 1-5 as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a suspended scaffold for facade inspection only as per plan submitted.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler modifications taking place on the 16th & 17th floor as per plans filed herewith. No change in use, egress, or occupancy.