3,402 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,402 permits
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Installation of temporary construction fence and sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy…
Structural modifications taking place on the 16th fl Construction/ 17th fl Marketing floor as per plans filed herewith. No change in use, egress or occupancy
Erect illuminated accessory businessd/f blade sign-b @west 48th st elevation as per drawing file herewith
Sprinkler modifications on floors SC1, Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
General construction modifications taking place on the 16th fl construction/ 17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Interior renovation of the duplex apartment associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
Mechanical modifications on floors Cel, 01, MZ1, 02 as per plans filed herewith, including commercial kitchen rangehood ventilation system for Jack D's Steakhouse.
Alteration type 3 - construction equipment - sidewalk- shed proposed installation of heavy duty sidewalk shed. no change in use occupancy or egress under this application. live loa…
Filing for plumbing and sprinkler work associated with interior renovation of 17th & 18th floors thomson reuters office as per plans
Demolition and Construction of Air Conditioning Ductwork, Supply Air Diffusers & Grilles and Return Air Grilles on Part of the 17th Floor
Installation of single cage 7000# capacity personnel/material hoist hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev…
Temporary hoist run-back structure during bldg alt, filed separately. hoist run-back structure shall comply with chapter #33 of the nyc building code. no change in use, occupancy o…
Structural changes as indicated on plans; including framing for new partition wall door.
Limited Exterior Facade Repairs including stone replacement, stone repairs, brickwork replacement, mortar joint repointing. No change to use, egress, or occupancy.
Structural modifications on MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
General construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy
Minor demolition with installation of new partitions on the 28th floor as per plans. No change to Use, Egress or Occupancy.
Removal of interior non-bearing partitions and related finishes as shown on plans. no chang to use, egress or occupancy.