3,402 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,402 permits
General construction modifications taking place on the 16th fl construction/ 17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
Temporary hoist run-back structure during bldg alt, filed separately. hoist run-back structure shall comply with chapter #33 of the nyc building code. no change in use, occupancy o…
Demolition and general construction work on 27th floor as per plans. No change to use, egress or occupancy.
Filing to remove and install new plumbing fixtures as per plans filed. no change to use, egress or occupancy.
Removal of interior non-bearing partitions and related finishes as shown on plans. no chang to use, egress or occupancy.
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Filing for plumbing and sprinkler work associated with interior renovation of 17th & 18th floors thomson reuters office as per plans
Install of temp Platform, Sculpture, no alt to exist structures for Vertical Highways. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All prod…
Sidewalk shed installation as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Herewith file to convert from existing deli store to bagel store. work scope to include installation and rearragement of equipement as well as refinishing of floor and wall tiles.…
Mechanical modifications on floors Cel, 01, MZ1, 02 as per plans filed herewith, including commercial kitchen rangehood ventilation system for Jack D's Steakhouse.
Install ductwork and new air conditioning unit per plans.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 22nd floor as per plans filed herewith. no change in use, egress, or occupan…
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Limited Exterior Facade Repairs including stone replacement, stone repairs, brickwork replacement, mortar joint repointing. No change to use, egress, or occupancy.
Plumbing work at cellar and 1st floor beauty salon of an existing 14-story building. related general construction work has been filed initially. no change in use, egress or certifi…
Interior renovation of the duplex apartment associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
General construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy