8,416 other permits filed recently
8,416 permits
General Construction as per plans filed herewith. No change to use, egress or occupancy.
General construction and associated work for the 2nd floor, no change in use, egress or occupancy.
Suspended Scaffold Installation for Facade Restoration and Inspection
General construction work for battery containment enclosures. No change to use, occupancy or exits under this application.
Structural modifications taking place in the cellar and on the 1st and 2nd floors per drawings filed herewith. no change in use, egress or occupancy.
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Change of use to establish new Eating and Drinking establishment on 1st Floor as per plans filed herewith.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a…
Installation of temporary shoring as per plans submitted herewith. there is no change in use, egress or occupancy.
Temporary Installations to be used on a temporary event Project Hail Mary. All the Installations are to be removed upon completion of the event.
Filing to remove and install new sprinkler heads & relocate fire-hose & sd connection as per plans filed. no change to use, egress or occupancy.
Rigging for Industrial Rope Access
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
F bldg sp ph3: sprinkler modifications to accomodate the sprinkler upgrades at the existinghospital building (f bldg.) as per plans. no change to use, egress or occupancy.
Proposed construction of the 8 stories mixed use building with 18 residential units and 2 community facility units
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…
Facade restoration to to floors 1st through 52nd floor as shown on drawings filed herewith. No change to use, egress, or occupancy