8,416 other permits filed recently
8,416 permits
Modifications to the existing sprinkler system on the 39th and 40th floors as per plans. No change to use, egress or occupancy.
Relocating fire hose cabinet on 4th floor.
Sprinkler modifications on floors 1-3 and Standpipe modifications on floors 1-2 as per plans filed herewith. No changes in use, egress or occupancy.
Sprinkler modifications on 14th floor (construction) / 15th floor (marketing). no change to use, egress or occupancy.
Installation of a heavy duty overhead protection as per plans in conjunction with general construction work. no change in use, egress or occupancy. overhead protection shall comply…
Proposed horizontal/vertical enlargement and change of use as per plans filed.
Construction of New Walls and built-in Millwork per plans filed herewith . No change to use, egress or occupancy.
Filing temporary loop application for a single family home. No change to use, egress or occupancy.
Temporary egress plan
Structural modifications as per plans filed herewith.
Installation of temporary working platform as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Installation of temporary suspended scaffold equipment.
MSM SP S. Blck - GENERAL CONSTRUCTION MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Modifications to the existing standpipe system on the 39th and 40th floors as per plans. No change to use, egress or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Filing for sprinkler work at the 2nd floor. No change to use, egress, or occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
To install new sprinkler heads and branch piping on the 3rd & 4th floors as per plans. no change in use, occupancy or egress.