Building Permits in ZIP 11207
Brooklyn, NY — 497 permits filed recently
497 permits
Installing a fire sprinkler system
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio...
alteration filed to repair fire frame existing 2-story and cellar 2 family frame dwelling. to restore electrical and gas service to have full vacate order lifted and to remedy ecb violations 39134612h...
Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio...
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Application for plumbing works only for existing 2nd floor, 1st floor, & basement as per plan of an existing two family dwelling. general construction filed under application # b01308616-i1. no change...
It is proposed to replace (2) 500 gal. hot water storage tanks in the boiler room on the roof with (3) 250 gal. hot water sotragte tanks as shown on plans. no change of use, egress or occupancy.
Sprinkler and standpipe work type filed in conjunction with nb #b00709512-i1
Sprinkler and standpipe work type filed in conjunction with nb #b00709512-i1
alteration filed to repair fire frame existing 2-story and cellar 2 family frame dwelling. to restore electrical and gas service to have full vacate order lifted and to remedy ecb violations 39134612h...
Installation of construction fence as per plan in conjunction with dob application gc #b01043155 - i1.
Installation of PV system on existing roof no change to egress or use of occupancy
Proposed installation of two prefabricated paint Spray Booths, with one prefabricated mix room, duct work thru ceiling and continuing on roof top for termination, and gas connection flammable burn uni...
Installation of PV system on existing roof no change to egress or use of occupancy
Installation of PV system on existing roof no change to egress or use of occupancy
Sprinkler and standpipe work type filed in conjunction with nb #b00709512-i1
Installation of PV system on existing roof no change to egress or use of occupancy
Proposed installation of two prefabricated paint Spray Booths, with one prefabricated mix room, duct work thru ceiling and continuing on roof top for termination, and gas connection flammable burn uni...
alteration filed to repair fire frame existing 2-story and cellar 2 family frame dwelling. to restore electrical and gas service to have full vacate order lifted and to remedy ecb violations 39134612h...