Building Permits in ZIP 11215
Brooklyn, NY — 980 permits filed recently
980 permits
Repair of sidewalk vault
Interior renovation for tenant fitout in mixed use building - in an existing eating & drinking establisment (under 75 persons)
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
Removal & reinstallation of plumbing systemthroughout 3 (3)-story, one (1) dwelling unit w/cellar as per plan show.
Bmh main campus: facade repair, including brick repointing, lintel repair and window replacement as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Bmh cch: facade repair as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Install new sprinkler system (53 new heads). install new plumbing fixtures at new roughing (2 w/m, 1 f.d., 7 lavs, 5 wc, 3 showers, 2 sinks, 2 dw, 1 tub). install new gas piping (2 stoves, 2 h.w.h.)
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
Repair of sidewalk vault
Removal & reinstallation of plumbing systemthroughout 3 (3)-story, one (1) dwelling unit w/cellar as per plan show.
Bmh cch: facade repair as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Bmh main campus: facade repair, including brick repointing, lintel repair and window replacement as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Interior renovation for tenant fitout in mixed use building - in an existing eating & drinking establisment (under 75 persons)
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Modifications to the existing building plumbing system to electrify hot water generator. no change in use or egress.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Plumbing work in apt 2 filed in conjunction with dob now gc. no change to use, occuapncy or egress.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
2 commercial spaces on the first floor are to be joined by a hallway. residential portion of ingress and egress is to be independent. install partitons in the new kitchen and add 2 new toilet rooms.
Install new sprinkler system (53 new heads). install new plumbing fixtures at new roughing (2 w/m, 1 f.d., 7 lavs, 5 wc, 3 showers, 2 sinks, 2 dw, 1 tub). install new gas piping (2 stoves, 2 h.w.h.)