Building Permits in ZIP 11215
Brooklyn, NY — 980 permits filed recently
980 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Renovation of commercial space in existing building on 1st floor . work to include demolition and new interior layout, doors, finishes & replcaement of exterior storefront & doors as per plans. no cha...
Modifications to the existing building plumbing system to electrify hot water generator. no change in use or egress.
Plumbing work in apt 2 filed in conjunction with dob now gc. no change to use, occuapncy or egress.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
2 commercial spaces on the first floor are to be joined by a hallway. residential portion of ingress and egress is to be independent. install partitons in the new kitchen and add 2 new toilet rooms.
Proposed rear addition,4th floor and penthouse to existing (3) story building (3) dwelling units.
Mechanical work including electric split system and mechanical toilet and kitchen exhausts systems.
Structural/foundation: framing modifications to accomodate altered interior layout, new rear deck and stairs.
INTERIOR renovation of existing 2 family with exterior renovation to remove rear extension . Architectural/ construction work only.
INTERIOR renovation of existing 2 family with exterior renovation to remove rear extension . Architectural/ construction work only.
Proposed rear addition,4th floor and penthouse to existing (3) story building (3) dwelling units.
Structural/foundation: framing modifications to accomodate altered interior layout, new rear deck and stairs.
Mechanical work including electric split system and mechanical toilet and kitchen exhausts systems.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Plumbing, Sprinkler and Standpipe applications in conjunction with new building.
Plumbing work filed in conjunction with the renovation of one family residence. Kitchen and bathroom renovation.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...