2,440 hvac permits filed recently
2,440 permits
subsequent filing for HVAC with duct works.
Modifications to the existing HVAC system on the 1st, Mezz and 2nd floors (Harry Winston - Retail) as per plans. No change to use, egress or occupancy
Mechanical modifications taking place on 37th floor construction (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Mechanical work on the 20th floor (restrooms) as indicated on drawings.
Removal of HVAC systems to satisfy violation #34455707X
Installation of 4 Panasonic ceiling exhaust fans and dryer exhaust ductwork for a new dryer
Modification to existing at&t telecommunications site. relocate (2) rrh units and remove (2) cabinet in existing equipment room in cellar. all in conformance with tppn 5/98. no change in use, egress,...
Removal of all existing HVAC systems and ductwork/piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical work on the 20th floor (corridor) as indicated on drawings.
test
Modifications to existing HVAC system and related piping for 3rd & 4th floor existing office suites. No change in use, egress or occupancy.
Mechanical work to lobby as per plans filed herewith. no change to use, egress or occupancy.
Gut renovation including demolition and removal of existing mechanical equipment, air handlers, boiler, flues, oil tank, radiators piping and ductwork.
Mechanical application in conjunction with alt-co application m01215799-i1
This application is being filed for Mechanical work at the subject premises per plans submitted herewith. No change in use, egress or occupancy in this application.