Filing for the following at the polo grounds towers 4, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
TO REMOVE EXISTING SPRINKLER SYSTEM TOTAL OF 91 SPRINKLER HEADS AND INSTALL NEW TEMPORARY SPRINKLER SYSTEM WITH 65 UPRIGHT SPRINKLER HEADS. AS PER DRAWINGS FILED HERE WITHIN. PROJECT IN CONJUCTION WIT...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Structural modifications taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Temporary standpipe modification to the the cellar as per plans filed herewith. no change in use, egress.
Installation of an ada compliant ramp at front & side of the building
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Mechanical work from the 2nd floor as plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Shoring of Underground Utilities
Mechanical work filed in conjunction with M01371067-I1.
Installation of a heavy duty sidewalk shed to include storage.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Removal of sprinkler heads; install temporary sprinkler loop on the 20th floor as indicated on drawings.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Conversion of first and second floors from retail use to eating and drinking Occupancy Croup A-2 and obtaning Certifiacte of Occupancy for same.
Filing herewith foundation work and minor structural work as per plans. no change in use, egress or occupancy.