8,563 other permits filed recently
8,563 permits
Slab opening and new stair from the 20th floor to the 21st floor (HIGHLIFE) AS PER PLANS. No change to use, egress or occupancy
General Construction modifications to take place on the 3rd floor as per drawings filed herewith. No change in use, egress, or occupancy.
A propoed foundation filing in conjunction with alt-co job #: m01285183-i1.
Herewith filing architectural work for lobby and facade modifications per plans . no change in use, occupancy or egress under this application.
IRA Rope Access Facade Inspection
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Application filed to reinforce existing 1st floor structural members as per the drawings filed herein. filed in conjunction with gc #m01326469-i1
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Upn/ps206m - for underpinning submitting on behalf of contractor, related job number # m00662616, m00913342 no change in use,occupancy or egress
Installation of sidewalk shed for public protection during construction work
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
A proposed structural filing in conjunction with alt-co job #: m01285183-i1.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Structural modifications taking place on the Cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
Sprinkler modifications taking place on the 13th and 14th floor ( 12a and 13th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Structural modification as per plans. No change to the use, egress or occupancy.