Other Permits in Manhattan, New York
11,285 other permits filed recently
11,285 permits
Replace windows
rear wall restoration with lintel and sill replacement. removal of fire escape remnants in masonry
Modifications to the existing mechanical system on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy.
chute will be built out, to assist with loading out of debris from floor to floor. Bobcat will assist with loading out debris from 1st floor
Application filed for address ecbviolation # 039180551k for maintain exterior building front wall cornice replacement as per plan, no change in use egress or any occupancy.
Installation of Heavy-Duty Sidewalk Shed. No change in use, occupancy, or egress.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Propose masonry window openings on 6th fl on east facade and 12th floor on east facade at the corner condition.
Proposed installation of heavy-duty sidewalk shed and supported scaffold as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no chang...
Modification of structural work, as per plans filed herewith. No change in use, egress, or occupancy.
Minor partition work in apt 12 with general Carpentry . No change to use bulk or egress
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for the proposed constr...
Install new sprinkler heads and related piping on 1st floor for new eating & drinking establishment. no change to use, egress or occupancy.
L-4 CARDIOLOGY Phase 4: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE...
Mechanical Unit(s) replacement along with associated duct work and fans.
Replace existing thru-wall ac unit in Apt 6C. No change to use, egress, or occupancy.
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no. 663 from 655 fifth a...
Modify existing sprinkler heads in coordination with the new reflected ceiling plans.
Removal of existing sprinkler head and installation of temp loop as per plans filed herewith. No change in use, egress or occupancy under this application .
Structural modifications as shown on filed plans