Other Permits in Manhattan, New York
11,314 other permits filed recently
11,314 permits
Playground upgrade (new turfed area and tracks; painted plays on the ground; new safety surface and play equipment; new plants in enlarged platers). New ADA compliant toilet accessories. Patching tile...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the south (west 63rd st) and west elevations from the top of the sidewalk shed to past...
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
structural work as shown on plans
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenwich st.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Construction work on the 10th floor (Ramboll) as indicated on drawings.
9th fl: interior removals as per plans filed herewith. no change to use, egress or occupancy
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Sprinkler work on the 10th floor (Ramboll) as indicated on drawings.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Interior demo of 19,20 & 21 floor interconnecting staircase approximately 750 square feet as per plans. No change in use, egress or occupancy.
Minor partition work in apt 1 with general Carpentry . No change to use bulk or egress
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Conversion of bldg (portions thereof) pursuant to Article I-Chapter 5(ZR), change of non-residential floor area to residences of any type proposed mixed use 2 family dwelling with non-residential use...
Sprinkler modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Herewith filing for removal of interior non load bearing partitions and doors as per plans. no change to use, egress or occupancy under this application.