first renewal for SR 22/0349 transfer of old method paper submission to DOB NOW filing M01002192 for facade inspection and work
Proposing Construction Fence on sidewalk during storefront work.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of temporary shoring as per plans submitted herewith. there is no change in use, egress of occupancy.
Suspended Scaffold for Facade Restoration as Shown on Plans
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No ch…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection. amend #8, added scaffold drops
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this app…
Modification of sprinkler system as shown on plans
FACADE RESTORATION WORK, INSPECTION, (added scaffolds at new locations)
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc buildinds code 2022 no change in use, egress or occupancy under this appli…
MSM SP S Block - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Application for installation and use of suspended scaffold as per plans filed herein. No changes in egress, use or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy, or egress under this application. the system sf is fully encl…
Structural bracing work as shown on plans
Installation of temporary construction fence as per plan. no change in use, egress, or occupancy. the plywood fence at the 7th ave elevation at the main entrance from the ground be…
General construction modifications taking place on floors 2, 4, 5, 6 as per drawings filed herewith. no change in use, egress or occupancy.