8,565 other permits filed recently
8,565 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed
Use of temporary material platforms as per plans filed herewith. This application is filed in conjunction with DOB NOW #M01128646.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary construction fence for ps 225m at 317 east 67 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy.
Replace brickwork and copingstones, spot pointing of masonry, miscellaneous caulking, wire brush and repaint existing fire escape.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy.
General construction for apartment 2F on 2nd floor