8,563 other permits filed recently
8,563 permits
asdt
Installation of 300psf heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
File suspended scaffold outrigger systems for facade restoration and inspection.
Suspended Scaffold out rigger installation for Facade inspections
Subsequent filing for structural work for dunnage for new cooling tower.
installation of suspended scaffold for facade work.
Modifications to the existing sprinkler system on the 8th Floor, as per plans. No change to use, egress, or occupancy.
1. install new steel columns/shores, beams, and steel deck in the cellar to support the existing concrete slab of the courtyard floor above. 2. all above as per attached plans and scheme b. (scheme a,...
Material hoist
Propose a very minor partition change as per plans filed herewith. no change to zoning, use, egress or occupancy
New partial sprinkler system & modification of existing sprinkler system as per the drawings filed herein.
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Propose to file for sprinkler temp loop. No change in use, egress or occupancy.
Herewith filing for structural plans of 5-storey brick & steel framed alt-1 building.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Divide existing apartments on 3rd and 8th floor to create 2 new apartments. no change in bulk or floor area.