Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Remove top portion of street parapet, new copping stone to address violation # 102425cfa1101ab as per plans filed. no change in use, egress or occupancy.
Install fire sprinkler system as per plans.
Propose to perform removal of interior partitions. No change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Install fire sprinkler system as per plans.
Remove top portion of street parapet, new copping stone to address violation # 102425cfa1101ab as per plans filed. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Rehab/ reconstruct (6) apt interiors #7-27-37-47-57-67 (after water + smoke remediation ) plus corridor work, interior finishes , non load bearing partitions , kitchen and bathrooms. Respond to Violat...
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
8936 - Extending existing elevator shaft to accommodate larger cab. No change in egress use group or occupancy. Pro Cert Requested.
Modify existing sprinkler heads in coordination with the new reflected ceiling plans.
Construction of a new exterior vertical lift.
Provide new 4 floor control valve assemblies connected to existing 8 standpipe on 7 floors with distribution and new sprinkler heads.
chute will be built out, to assist with loading out of debris from floor to floor. Bobcat will assist with loading out debris from 1st floor
Modifications to the existing mechanical system on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy.
Filing herewith sprinkler work as per plans, no change in use, egress or occupancy.
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no. 663 from 655 fifth a...
Mechanical Unit(s) replacement along with associated duct work and fans.
Propose to perform removal of interior partitions. No change in use, egress or occupancy.