Pool & Spa Permits in Manhattan, New York
905 pool & spa permits filed recently
905 permits
Proposed interior renovation for the tenant fit-out to the existing space, install new non-bearing partitions and doors, no change in use, egress and occupancy.
Modification of existing automatic wet sprinkler system by installing Temporary Sprinkler Loop and New Sprinkler Piping in existing commercial space (Carolina Herrera) on Cellar, 001 thru 003 Floors....
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Commercial tenant interior fit-out for existing store space. no change in use, egress, or occupancy.
General construction consisting of renovation of existing pool locker rooms on 2nd sub cellar level as shown herewith. no changes to egress, occupancy or use.
Commercial tenant interior fit-out for existing store space. no change in use, egress, or occupancy.
Renovation of existing office spaces on the 8th floor as per drawings filed herewith. no change to use, occupancy, or egress
CleanSpace to install a temporary exhibit within an existing exhibition building. CleanSpace Booth #2235 on LVL 3 / Exhibit Hall 3B for Interphex 2026. Scheduled construction 04/17 - 04/24. No change...
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
Proposed interior renovation for the tenant fit-out to the existing space, install new non-bearing partitions and doors, no change in use, egress and occupancy.
install new kitchen exhaust system and ductwork in commercial space.
Partial interior renovation of an existing commercial space on the 1st floor. no change to use, egress or occupancy.
Interior renovation to an extg ground floor retail space. no change to occupany or egress. all work is considered cosmetic.
Repair existing vault space to include the replacement of deteriorated steel beams, and storefront cladding (no change in storefront opening). No change in use egress or occupancy.
Structural Modifications associated with escalator demo/rebuild, slab infill and new stair opening, new footings, new partial deck on the Cellar & 1st Floor as per plans (Retail Space.) No change to u...
Alt-CO filed to convert existing retail space to office.
Application file to amend existing certificate of occupancy #112741 for the cellar & 1st floor including a new mezzanine in conjunction with the 1st floor commercial space.
Strcutural work consisting of providing structural support for a new pool lift as shown here with. no changes to egress, occupancy or use.
Submit temporary construction fence work at open space, in conjunction with application job#M01285183, no change in use, egress or occupancy.
Interior alterations of existing 37 and 38th floor commercial office space. no change to use, occupancy or egress