Pool & Spa Permits in Manhattan, New York
910 pool & spa permits filed recently
910 permits
Installation of 20 heads at shared lobby space
General construction work for a pool renovation. No change to use, egress or occupancy.
Build out of office space at the 6th floor. No change to use, egress or occupancy.
Filing herewith for the renovation of an existing first-floor commercial space. Scope of work includes removal and installation of interior non-bearing partitions. No changes to use, egress, or occupa...
Interior office renovation of office space.
Propose to install new non-illuminated metal letters on aluminum raceway for existing commercial space. no change to use, egress or occupancy.
Interior office renovation of office space.
Propose to install new non-illuminated metal letters on aluminum raceway for existing commercial space. no change to use, egress or occupancy.
Proposed renovation at existing commercial space for an eating & drinking establishment at the first floor. no change in use, egress and occuapcny.
Filing herewith for the renovation of an existing first-floor commercial space. Scope of work includes removal and installation of interior non-bearing partitions. No changes to use, egress, or occupa...
Interior renovation of existing 1st floor commercial space as per plans. no change in use, egress, or occupancy.
Interior renovation of commercial space (Zoc Doc)
Build out of office space at the 6th floor. No change to use, egress or occupancy.
This alt gc application is being filed for the tenant fit-out of an existing retail space in a high rise office building. work includes new shuttle lula elevator and convenience stair, self levelling...
Renovation to existing space on 2nd floor. no change to use, occupancy or egress.
Proposed co alteration to convert existing retail space into medical offices including installation of new non-bearing partitions, fixtures, finishes and casework and including obtaining new (amended)...
General construction for interior renovations of commercial office tenant spaces on floors 3, 9, and 14(C)/15(M), as shown on plans filed herewith. No change in use, egress or occupancy.
Interior Renovation of an Existing Commercial Retail Space at the Ground Level of a Mixed-Use Building. No change to Use, Bulk, Occupancy or Egress.
Interior renovation of existing office space, partitions and drop ceilings on the 14 floor (14 fl marketed as 15) as per plans filed no change in use occupancy or egress
Interior renovation of existing commercial space as per plans. no change in use, occupancy, or egress.