Renovation Permits in Manhattan, New York
4,119 renovation permits filed recently
4,119 permits
Interiro renovation existing dwelling with partition work on 1st floor. no change in use, egress or occupancy.
Interior renovation of apt #20C. New finishes & millwork, replacement of kitchen & bathroom fixtures & appliances (filed under separate DOB application). Replace windows in existing opening. New LED i...
Replacement of cracked brick masonry, repair of cracked terra cotta and stone units, replacement of deteriorated steel lintels. no change to use, egress, or occupancy.
General construction for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Modifications/additions to existing foundation associated with the Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration as per plans filed herewith. No change in use, egress or occup...
General construction for lobby renovations to include new marquee as per plans filed herewith. No change to use, egress or occupancy.
Application being filed for the interior renovation of an existing restaurant. Work to include decorative ceiling and wall treatments, one non-load bearing partition and countertops. No change in use,...
Renovations of apartment 9F at the 9th floor of an existing multiple dwelling building. No change in use, egress or occupancy.
Facade alteration as per plans filed herewith. no change to use egress nor occupancy.
Filing herewith general construction to include interior renovation and minor demo to existing apartments as per plans
Interior renovation and mechanical hood of for commercial kitchen at basement floor #c4, as per plan filed herewith. no change in use, egress or occupancy.
Facade repairs as per plans filed herewith. No change in use, egress or occupancy.
Masonry Facade repairs as per plans.No change to use, occupancy, or egress.
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Enmanuel Martinez Ortiz
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Renovation of existing 4-story combined residential buildings.
Interior Renovation of existing apartment associated with the General Construction scope. No change in use, egress, or occupancy under this application.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Darius Janczak