Renovation Permits in Manhattan, New York
4,172 renovation permits filed recently
4,172 permits
Interior renovation of existing apartment at first floor. no change to use, egress or occupancy.
Interior renovation of an existing eating & drinking establishment ug6 including the installation of non-load bearing partitions, countertops, floor & wall finishes as per the drawings filed herein. n...
Installation of suspended scaffold for facade inspection/repair.
General construction for interior renovation of Apartment 9G on the 10th floor, as shown on drawings filed herewith. No change in use, egress or occupancy.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Sidewalk vault repairs. no change in use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade repair work at 188 east 64th street, manhattan, ny 10065
Filing for alterations at 2nd floor to convert retail showroom and accessory uses to Eating & Drinking Establishment in conjunction with Diner below. Obtain new Certificate of Occupancy.
Outriggers system installation for inspection of facade and repairs.
Sidewalk Replacement and Vault Repairs as per plans filed herewith. No change of use, egress or occupancy.
Limited Exterior Repairs. No change to use, egress, or occupancy.
Interior renovation of first, second, and third floors including 2 new convenience stairs and adjusted window openings.no change in use, occupancy, or egress.
Interior renovation on first floor as indicated on plans filed herewith. no change in use egress or occupancy under this application
Interior renovation of existing eating and drinking establishment on the basement and first floor as per CO 120819061. No changes to use, egress or occupancy.
Sprinkler work in conjunction with renovation of 6-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Interior renovation of apt #20C. New finishes & millwork, replacement of kitchen & bathroom fixtures & appliances (filed under separate DOB application). Replace windows in existing opening. New LED i...
INTERIOR RENOVATION WORK AT 4th & 5th FLOORS CONSISTING OF INSTALLATION OF A NEW CONVENIENCE STAIR AND INFILL OF EXISTING CHIMNEY.
Interior renovation of mechanical systems as shown on filed plans
Installation of supported scaffolding for facade repairs.
Interior renovation of apartment 706 on the 7th floor. no change to use, egress, or occupancy.