1,240 roofing permits filed recently
1,240 permits
9th Cycle FISP Repair & Roofing Replacement Program. No change to Use, Egress or Occupancy.
Blg 2 - roof repairs as per plans filed herewith. no change in use, egress or occupancy
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Replace special gas vent from existing water heaters to roof.
Plumbing Work Floor 21,22,roof - APT of Apartment 21C, illustrating the location of the new pump system, its connection to the building risers, plumbing riser diagram, and details…
Facade reconstruction work including roof replacement. All work as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.
Hereby filing Relocation of existing standpipe piping and replacement of existing 3-way roof manifold as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this a…
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application. the pipe…
Filing herewith general construction to include waterproofing and structural modifications as per plans.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 1, 2, 5, 8, Roof as per plans (Demo & Whitebox.) No change in use, egres…
Minor interior demolition, removal of interior non-load bearing partitions and finishes on the 1, 2, 5th and Roof as per plans (Hines Demo & Whitebox.) No change to use, egress or…
Filing for exterior repairs on roof and all facades, including parapet reconstruction, facebrick replacement, repointing, lintel reconstruction, and fire escape member repairs. No…
Minor modifications to the roof, work includes new decking, new screens to cover existing parapets, not to exceed 4. An additional mechanical screen to conceal the pipes is propose…
Upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Temporary roof-overhead protection at adjoining properties during nb const, filed sep. roof-overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy…
Hvac design with roof heat water tank, elevator machine room, lobby ac design and air curtain, boiler room
Application filed for Roof Replacement as per plan herewith. No change in use, egress or occupancy.
Main roof, bulkead roofs & terracer eplacement as per plans filed herewith. no change to use, egress or occupancy.