Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Replacement of existing gas dryers in existing laundry room. minor non-structural demolition of interior partition walls. no change in use, egress, or occupancy.
Interior non-structural demolition of 1st and 2nd floors, including removal of non-load bearing partitions, finishes, doors, storefront elements at eating and drinking establishment, as per the archit...
Full demolition to a two story building
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Full demolition to a one story building
Mechanical Demolition of Comfort Station Building in East River Park as part of the East Side Coastal Resiliency (ESCR) project.
Interior demolition of existing mechanical systems as shown on filed plans.
Replacement of existing gas dryers in existing laundry room. minor non-structural demolition of interior partition walls. no change in use, egress, or occupancy.
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.
Interior non-structural demolition of 1st and 2nd floors, including removal of non-load bearing partitions, finishes, doors, storefront elements at eating and drinking establishment, as per the archit...
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
Interior demolition of partitions, doors as indicated on plans.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.
Filing herewith for minor interior demolition and modifications of non-load bearing partitions, ceilings, doors and floors as per plans filed herewith. no change in use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Filing herewith for minor interior demolition and modifications of non-load bearing partitions, ceilings, doors and floors as per plans filed herewith. no change in use, egress, or occupancy.
Interior demolition of partitions, doors as indicated on plans.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.